A year or so after a degree programs undergoes a self-study review, a PEQAB renewal site visit will occur. This visit includes a
panel meeting, which is usually attended by Joy or Michelle. Information will need to be compiled and sent to Joy and Michelle so that whichever one of them will be attending the meeting can prepare it.
In rare cases, the library is asked to participate in a practice-run PEQAB visit, called an External Program Evaluation
Committee (EPEC) visit, prior to the actual PEQAB renewal site visit. These visits are set up by the college to make sure everything is ready for the actual PEQAB visit, with the college choosing the panel of assessors. Everything else about the visit is the same as for the PEQAB renewal site visit though.
The following instructions describe how to prepare for an upcoming EPEC renewal visit (see left-hand column instructions) or PEQAB renewal visit (see right-hand column instructions) for an existing degree.
In order to ensure that Joy / Michelle will have all of the information needed for the EPEC panel discussion, email the following information to Joy, Michelle, Joanne and Pam:
Below are handouts prepared by library staff in preparation for existing degree EPEC renewal site visits. These visits serve as preparation for actual PEQAB renewal visits, and the library only started creating them in 2017.
BEGINNING IN SEPTEMBER 2022, THE COLLEGE'S PROGRAM QUALITY TEAM DOES NOT WANT THE LIBRARY TO PROVIDE A HANDOUT FOR PHASE D SITE VISITS.
The following programs have undergone an EPEC renewal site visit:
The following programs have not yet undergone an EPEC renewal site visit:
In order to ensure that Joy / Michelle will have all of the information needed for the PEQAB panel discussion, email the following information to Joy, Michelle, Joanne and Pam:
Below are handouts prepared by library staff in preparation for existing degree site visits. These renewal visits occur as part of PEQAB's review of existing (currently running) degree programs.
BEGINNING IN SEPTEMBER 2022, THE COLLEGE'S PROGRAM QUALITY TEAM DOES NOT WANT THE LIBRARY TO PROVIDE A HANDOUT FOR PHASE D SITE VISITS.
The following programs have undergone a PEQAB renewal site visit:
The following programs have not yet undergone a PEQAB renewal site visit: